Preventer

For Controlling Water Ingress

TITAN Preventer is used in conjunction with micropiles in areas where water ingress is a distinct possibility, for example in basement areas and underground car parks. The Preventer is used on sites where lowering the ground water is not possible.

The Preventer valve system is connected to a compressor via an air line. The system is operated by opening and closing the rubber insert, by applying air pressure to inflate (close) or deflate (open) the rubber insert. When the rubber insert is in the closed position, it restricts the ingress of water, whilst pressing tight against the micropile, allowing the installation and grouting to be completed.

The Preventer is fixed securely to the structure prior to commencing the installation. It is removed once the grout has completely cured, exposing the top of the micropile ready for the head detail to be constructed.

Installation

Installation through the Preventer involves adjusting the pressure to allow a ‘gentle’ backflow, which is essentially employed to lubricate the rubber insert. It is the responsibility of the Preventer engineer to determine the required pressure during the installation process.

The micropile installation uses a water flush, depending of geological conditions, however on occasions a cement grout, with a water cement ratio of 1 (by weight) can be used as a flushing fluid. The quality of the cement grout body and bond are improved by adopting a slower drilling rate and frequently cleaning out the drill hole. This process known as reaming, involves repeatedly extracting and reinserting the drilling rod/micropile, while continuing to rotate the rod and flushing out the drill hole. This procedure allows the debris to be flushed from the drill hole to the surface and was continually monitored by the drilling operative.

Grouting

Once the micropile reaches the required design depth, dynamic pressure grouting is undertaken. Dynamic pressure grouting is the term given to the simultaneous process of injecting grout, whilst rotating the micropile tendon, resulting in a dense grout body encapsulating the tendon.

The stiff grout mix displaces the thinner flushing medium used to support the drill hole, encouraging it to return to the surface.

Product Benefits

  • Allows the installation of micropiles and tie back anchors without the need for dewatering
  • Safe, controlled and efficient installation
  • Economical installation, when compared to dewatering
  • Simple operating procedures
  • Easy to use


Product Gallery

VERSATILE AND EFFECTIVE GROUND ENGINEERING SOLUTION


Case Study

Preventer Used In Dubai Hotel Project

A Dubai building had undergone some structural movement within the basement, leading to cracked columns, walls and slabs. Water had penetrated through cracks in the basement slab and walls. The building is located in Deira, approximately 500m from the creek. The structure was built in 2007 and consisted of 8 stories and two basements.

An assessment of the building was carried out and the consulting engineer compiled a detailed design to enhance the stability of the structure, which involved a combination of grouting and micropiling.

preventer