Victoria Bridge Hebburn

Ongoing essential maintenance to the network across Tyne and Wear saw ground anchors in the wing wall to the east of the bridge. Maintenance during a blockade of 48 hours saw driller Van Elle drill 29 anchored bars using 30/16 ‘Titan Hybrids’ with galvanised top section and top hat arrangement to protect the bars at the interface from corrosion.

Product: 30/16 black/Hybrid

Contractor: Buckingham Group

Client: Nexus

Installer: Van Elle