
Tanners Bridge North Shields
Ongoing essential maintenance to the network across Tyne and Wear saw ground anchors in the wing wall to the West of the bridge in preparation for a full bridge replacement.
Using Ischebeck Titan 30/11 black and galvanised, commonly known as the ‘Titan Hybrid’ system. The anchors are designed for 120 years and installed by Pennine Geotechnics.
Product: 30/11 black/Hybrid
Client: Nexus
Contractor: Taziker
Installer: Pennine Geotechnics





