
Bamford Cutting | Trans Pennine Route
Soil nailing is by far the most cost-effective remediation system currently on the geotechnical market when a slope needs to be repaired. As part of the Trans Pennine route upgrade, Bamford Station in the Peak District took full advantage of our system.
Designed by Mott McDonald and installed by Keller, this is a fantastic example of soil nailing for a major client having confidence in the performance of the Titan hollow bar.
Product: 30/11 Galvanised Titan hollow Bar
Client: Network Rail
Contractor: Story/Volker rail JV
Installer: Keller
Consultant: Mott McDonald




